Los Alamos Wastewater Treatment Plant

Treatment Process Integration

Market: Specialty Work
Timeline: June 2022-March 2023

Project Description:

Construction of a 1,200 SF Tertiary Filter Building to house two (2) Tertiary Filters, Installation and procurement of the Tertiary Filters and Site Piping, Grading, and minor installation of curb, manholes, and miscellaneous site improvements.

en_USEnglish

SUBSCRIBED

Welcome to the RMCI notification list.

Self-Performed Construction Services

  • Constructability & Value Engineering Reviews
  • Process Piloting
  • Operability, Maintenance, & Lifecycle Evaluations
  • Earthwork & Mass Excavation
  • Structural Concrete & Water-Bearing Structures
  • Cast-In-Place Concrete
  • Precast Concrete
  • Structural Steel & Misc Metals, Fabrication & Erection
  • Process Equipment/Mechanical & Interconnections
  • Prefabrication (On & Offsite) and Modular Installation
  • Mechanical & Process Piping
  • Utility Installation (Wet/Dry)
  • Process Heating, Cooling for Gas & Liquid Systems
  • Electrical, Instrumentation, & Controls
  • Integrated Automation
  • Facility Start-Up, Commissioning, and O&M Support