White Rock WWTP

Facility Replacement

Market: Wastewater Treatment Plant
Timeline: 2022-TBD
Final contract value: $25,570,092

Project Description:

The Project includes the following Work: Improvement of the White Rock Water Resource Recovery Facility to include new construction of process facilities and re‐purposing of select existing facilities and equipment. The project shall include site grading and paving, piping, HVAC & plumbing, demolition of select structures and walls, re‐modeling and relocation of select existing buildings, construction of new buildings and concrete structures, mechanical installation, instrumentation and controls, electrical installation, plant commissioning, and plant testing. The existing White Rock Water Resource Recovery Facility is operational and must remain operational throughout the construction duration of this project.

SUBSCRIBED

Welcome to the RMCI notification list.

PROFESSIONAL Capabilities

  • Clearing & Grubbing
  • Mass Excavation 
  • Soil Conditioning
  • Deep Foundations
  • Wet & Dry Utilities 
  • Precast Concrete
  • Cast-In-Place Concrete
  • Water-Bearing Structures 
  • Process Equipment 
  • Process Mechanical 
  • Miscellaneous Metals Fabrication & Installation
  • Structural Steel Erection
  • Industrial Linings & Coatings
  • Pipeline Refurbishment 
  • Facility Startup & Commissioning
  • Facility Operation & Maintenance Support