Anthony WWTP Expansion Project

Facility Expansion

Market: Wastewater Treatment Plants
Timeline: August 2022-October 2024

Project Description:

The Anthony Wastewater Treatment Plant Expansion Project consists of the installation of temporary UV disinfection and associated piping and electrical work to bypass the existing UV disinfection channel. Additional specs include: Construction of elevated entrance works structure; Exclusive of grit removal equipment; a second main plant structure and associated facilities; overhead pipe bridge structure; administration laboratory building; and yard piping and 14-inch diameter steel air piping.

en_USEnglish

SUBSCRIBED

Welcome to the RMCI notification list.

Self-Performed Construction Services

  • Constructability & Value Engineering Reviews
  • Process Piloting
  • Operability, Maintenance, & Lifecycle Evaluations
  • Earthwork & Mass Excavation
  • Structural Concrete & Water-Bearing Structures
  • Cast-In-Place Concrete
  • Precast Concrete
  • Structural Steel & Misc Metals, Fabrication & Erection
  • Process Equipment/Mechanical & Interconnections
  • Prefabrication (On & Offsite) and Modular Installation
  • Mechanical & Process Piping
  • Utility Installation (Wet/Dry)
  • Process Heating, Cooling for Gas & Liquid Systems
  • Electrical, Instrumentation, & Controls
  • Integrated Automation
  • Facility Start-Up, Commissioning, and O&M Support