The Anthony Wastewater Treatment Plant Expansion Project consists of the installation of temporary UV disinfection and associated piping and electrical work to bypass the existing UV disinfection channel. Additional specs include: Construction of elevated entrance works structure; Exclusive of grit removal equipment; a second main plant structure and associated facilities; overhead pipe bridge structure; administration laboratory building; and yard piping and 14-inch diameter steel air piping.